Production optimization
Field J through-tubing gas lift optimization
Hibiscus Petroleum · Field J, Sabah Waters
Problem & challenge
Selected wells with 4.5" tubing required improved production performance and more efficient use of gas lift injection. A practical intervention was needed to enhance lift performance without major well modification.
Objective
- Increase production, stabilize well performance and improve gas injection efficiency using a through-tubing production optimization solution.
Solution
TRC Super Sonic Tool (SST) technology was deployed in three wells as a thru-tubing gas lift optimization solution.
Result
A super charged gas lift showed improved production, more stable well performance and better gas injection efficiency.
Related case histories
Field I through-tubing gas lift optimization
Hibiscus Petroleum · Field I, North Sabah
A super charged gas lift showed improved production, more stable well performance and better gas injection efficiency.
Field L remote well monitoring during infrastructure blackout
SapuraOMV · Field L, Offshore Sarawak
Continuous well pressure visibility was maintained throughout the blackout period, giving the customer reliable remote access to critical well data without permanent platform power.
RYTE Production Chemistry
Field reference · Permian Basin (Scale Control)
305 days treatment duration, zero scale on pump and motor stages, and an estimated 29% cost reduction.